Ha’me Kitchen Renovation
Kwa’lilas Hotel, Port Hardy, BC
Project Overview
The Ha’me Kitchen renovation at the Kwa’lilas Hotel modernized a 578 sq. ft. kitchen facility to enhance operational efficiency and guest experience. This project involved comprehensive upgrades to electrical, mechanical, and plumbing systems, along with structural modifications and high-quality interior finishes. Completed within a tight 50-day schedule, the renovation was carefully executed to minimize disruption to hotel operations while delivering a fully commissioned, modern kitchen that strengthens the hotel’s role in supporting tourism and local economic growth.
Project Information
This hotel infrastructure renovation for the Kwa’lilas Hotel involved upgrading an existing commercial kitchen through selective demolition, structural modifications, and the installation of new appliances and equipment. Interior finishes were completed in alignment with design requirements, resulting in a modern, efficient, and functional kitchen space.
The project also included comprehensive upgrades to mechanical, electrical, and plumbing systems to improve performance and reliability. Work was carefully phased to accommodate ongoing hotel operations, with construction scheduled during off-hours to minimize disruption. Close coordination with engineers and subcontractors ensured smooth execution, while plumbing adjustments were made to integrate new systems with existing infrastructure, delivering a fully commissioned and enhanced facility.
Highlights:
Seamless modernization of an active hotel kitchen through efficient planning and execution
- Operational renovation completed with minimal disruption to hotel services
- Fully modernized kitchen with upgraded building systems
- Efficient delivery achieved through coordinated planning and execution
Project Timeline
April 2024
Site preparation, protection measures, and selective demolition carried out while maintaining ongoing hotel operations
May 2024
Structural framing completed alongside coordinated rough-in of mechanical, electrical, and plumbing systems
June 2024
Installation of ductwork, fire protection systems, drywall, and integration of kitchen infrastructure elements
July 2024
Completion of finishes, painting, appliance installation, system commissioning, and final inspections for operational readiness